Samsung RF28JBEDBSR Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 120
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
English - 16
Connecting to the water supply line
1. First, shut o the main water supply.
2. Locate the nearest cold water drinking line and
install the pipe clamp and shut o valve.
Pipe clamp
Cold water line
Shut o valve
3. Connect the water line installation kit to the
shut o valve.
Shut o valve
Pipe clamp
Cold water line
Water line installation kit
Connecting the water supply line to
the refrigerator.
There are several items that you need to purchase
to complete this connection.
You may find these items sold as a kit at your local
hardware store.
Use Copper Tubing Use Plastic Tubing
¼” copper tubing
¼” compression nut
(1pc)
Ferrule (2pc)
¼” plastic tubing
Molded end(Bulb)
¼” compression nut
(1pc)
Compression
Nut (1/4”)
(Assembled)
Ferrule
(Not supplied)
Plastic Tubing
(Assembled)
Compression
Fitting
(Assembled)
Molded
end(Bulb)
Compression
nut (A) (1/4”)
(Not supplied)
or
Copper tubing
(Not supplied)
Plastic tubing (B)
(Not supplied)
Household water supply line
Refrigerator
1. Connect the household water line to the
assembled compression fitting.
If you are using copper tubing, slip the
compression nut ( A ) (not supplied) and ferrule
(not supplied) on the copper tubing (not supplied)
as shown.
If you are using plastic tubing ( B ) , insert the
molded end (Bulb) of the plastic tubing ( B ) into
the compression fitting.
CAUTION
Do not use without the molded end (Bulb) of the
plastic tubing ( B ).
DA68-02952B-03.indb 16 2015. 11. 5. �� 5:08
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 119 120

Comments to this Manuals

No comments