
CHAPTER 3. Mounting and Replacing Boards
3-16
© SAMSUNG Electronics Co., Ltd.
3.3.1.2 WIM
The procedure for setting the jumpers and mounting optional boards on the WIM (WAN
Interface Module) is as follows:
1) Set jumpers JP1 through JP4 of the WIM.
Figure 3.13 Jumper Setting of WIM
Managed LIM function
The Managed LIM is controlled by the WIM and provides the extension functions
related to the Layer 2 QoS management such as 802.1p (packet priority), 802.1q
(VLAN) and IGMP Snooping, etc besides Layer 2 switch functions.
To perform the Managed LIM function to manage the LIM in the WIM, the WIM
and the LIM must be mounted on slot 1 and slot 2, respectively.
2) Align the connector of the WIM to that of the WIMD and firmly press the board
downward.
Figure 3.14 Mounting WIMD on WIM
WIMD
LAN port in the front
panel to connect to Ethernet
Jumper to connect to the LIM
board in slot 2 through the rear
panel (fornt socket in the WIM
board is not used at
this time.)
JP1
JP4
Comments to this Manuals