Samsung AP0AS0AN User Manual Page 52

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 51
51
ENGLISH
Check lists after completing the installation
After completing the installation, you must check the following.
Installation
Indoor unit
Have you checked the external surface and the internal part of the indoor unit?
Is the place well-ventilated and ensures space for service?
Have you checked if the center of the indoor unit is ensured and it is installed horizontally in
level?
Have you connected refrigeration pipes properly?
Outdoor unit
Have you checked the external surface and the internal part of the outdoor unit?
Is there any possibility of short circuit due to the heat of an outdoor unit?
Is the place well-ventilated and ensures space for service?
Is the outdoor unit xed securely?
Refrigerant pipe work
Have you checked for any gas leakage?
Are the length and the height dierence between the refrigerant pipes within the allowable
range?
Have you properly insulated pipes?
Is the quantity of the additional refrigerant correctly weighed in?
You must record the amount of additional refrigerant charging on the service record label
placed outside the outdoor unit.
Installing the drain pipe
Have you completed the drain test?
Is the drainpipe properly insulated?
Wiring work
Have you checked for interference between the power and the communication cable?
Have you performed the earthing work 3 to the outdoor unit?
Is the length of the wire within allowable range?
Is the wiring route correct?
Have you used veried power supply cable and the communication cable?
Option
Check whether the vibration-resistance frame is correctly installed if there is a possible
vibration of the outdoor unit.
PAC_아프리카 중동향AP80S0A_IBIM_34514A-02_EN.indd 51 2015-04-23 오후 2:19:00
Page view 51
1 2 ... 47 48 49 50 51 52 53 54 55 56

Comments to this Manuals

No comments