3-2-2(h) Refrigerant Adjustment
3-2-2(i) Flare nut fixing torque
Class For installation
For service
Outer diameter
ø 6.35 (Liquid Side)
ø 9.52 (Gas Side)
ø 12.7 (Gas Side)
160
300
500
200
350
550
Fixing Torque Final Torque
Torque (kg-cm)
Connection
Pipe Length
5m Max.
5~10m
Air-Purge
Method
Refer to the
detailed Air-Purge
Procedure
Refrigerant
Adjustment
Unnecessary
Add 10g of refrigerant
R410A(Add as liquid
state) for every 1m.
Air-Purge
Method
Purge air using a
vaccum pump
Refrigerant
Quantity
refer to
specification sheet
Add 10g of refrigerant
R410A(Add as liquid
state) for every 1m.